Cables: voltage drop and wire size
Voltage drop for single-phase, three-phase and DC circuits, in copper or aluminum. Find the drop, the longest run, or the smallest conductor that keeps you under your limit. Cable size picks the conductor from NEC Table 310.16 (75 °C column, per 110.14(C)) or IEC 60364-5-52. Conductor resistance is included. Derating for ambient temperature and grouping is in Pro.
NEC 220 service load calculation (Pro)
Dwelling service and feeder load under NEC Article 220. The standard method covers general lighting (220.41, Table 220.45), appliances (220.53), dryers (220.54), ranges (Table 220.55), the larger of heating or A/C (220.60), motors (430.24) and EV chargers (220.57). The optional method follows 220.82(B) and (C). It checks the minimum service of 230.79(C), and its results are tested against the NEC Annex D examples.
120/240 V panel schedule (Pro)
Enter the 1-pole and 2-pole loads of a 120/240 V single-phase panel and ElectroCalc lays out the schedule. Two-pole breakers take one space on each leg, and 1-pole circuits are balanced largest first onto the lighter leg. You get the current on L1 and L2, the imbalance and the smallest common bus rating that carries the heavier leg. This is connected load; use the service load calculator for the Article 220 demand load.
Solar: PV string sizing and the 120% rule (Pro)
PV string sizing uses the cold-temperature maximum voltage of NEC 690.7(A) and the circuit current of 690.8(A) and (B), with 690.9(B) for overcurrent protection. The busbar check applies the 120% rule of 705.12(B)(2) and the other busbar methods of 705.12(B), and sizes the PV breaker at 125% of the inverter current under 705.30(B), so you can check a backfed solar breaker against the panel before you install it. If the rule fails, it shows the main breaker or busbar that would pass.
EV charger circuit and load management (Pro)
Size an EV charger branch circuit under NEC 625.41 (125% continuous load) and 625.42. It accounts for an energy management system limiting the charger (625.42(A) and (B), 750.30), and it gives the EV load to carry into the service calculation (220.57, 220.70).
Conduit fill, box fill and protection
Conduit fill uses NEC Chapter 9 Tables 1, 4 and 5 for EMT and PVC with THHN/THWN-2. Box fill follows Table 314.16(B). The protection tools cover breaker and fuse selection (240.4, 240.6(A)), short-circuit current, RCD/GFCI selection, equipment grounding conductor size (Table 250.122), earth rod resistance and a single-line diagram with the fault level at every board. All of these are Pro.
Motors, transformers and power factor
Motor full-load current, with the NEC Table 430.248 or 430.250 current that 430.6(A)(1) requires, motor speed and slip, starting current, starter and protection sizing (430.22, 430.32, Table 430.52(C)(1)) and running a three-phase motor on single phase. Transformer current and ratio, fault current, losses and efficiency, and power factor correction.
Basics, AC circuits, electronics and reference
Ohm's law and power, series and parallel resistors, voltage and current dividers, single- and three-phase power, the power triangle, RLC impedance, resonance and neutral current. Resistor and capacitor codes, LED resistor, 555 timer, LM317, battery and UPS runtime, off-grid solar, EV charging time, a unit converter and AWG to mm². These are all free.